yuhuu~
~2nd day~
Today, me and my colleague learned about PSSU(Power System Simulator for Utilization) and PSS/Adept(Advanced Distribution Engineering Productivity Tool) which used to model,simulate and analyse network in a distribution system.
and we have been assigned an assessment of Pulau Pangkor System Schematic Diagram .We need to know about the node,voltage(kV),static load(kva,pf),input data(from-to),Length(km) and size needed in order to get the output. we took 4 hours to finish the assessment. There were some errors which we can see the diagram became red in colour, so, in order for us to fix the system, we need to alter the system until the line become green in colour. moreover, we have to suggest about the best point in the network during breakdown happen.
an utility company also need to get the power factor equal or almost 1 to reduce losses otherwise they can install the capacitor bank.
it was cool after we managed to finish it..
and we have been assigned an assessment of Pulau Pangkor System Schematic Diagram .We need to know about the node,voltage(kV),static load(kva,pf),input data(from-to),Length(km) and size needed in order to get the output. we took 4 hours to finish the assessment. There were some errors which we can see the diagram became red in colour, so, in order for us to fix the system, we need to alter the system until the line become green in colour. moreover, we have to suggest about the best point in the network during breakdown happen.
an utility company also need to get the power factor equal or almost 1 to reduce losses otherwise they can install the capacitor bank.
it was cool after we managed to finish it..
this one is still not finish.the system is still not stable yet.in order to make it finish, all the line and nodes should be in a green colour. after do some changes, it's done!
and i forgot to take the picture.
~3rd day~
Today, i went to my first site visit at PPU at Sik.
after the explaination, suddenly the green lamp turned on. this means that trip happened. so they call the AP (authorized person) to check and fix the problem. the feedback from the AP, he said that it is because of the tnb people hacked the groud to install cable.


Trasmittion from PMU Sg Tiang to Bhg Pembahagian Batu Kemelung
it is step down from 33 kV - 415 V.
that's all
bye2~!
No comments:
Post a Comment